roTEAMnet

VP of Capital Projects

kunin · Chattanooga

Normă întreagăContract / B2B

Formulări din sursă, separat de potrivirea profesională. Remote nu înseamnă automat eligibilitate globală sau program flexibil.

Sursa originală: Ashby · Publicat 2026-10-12 · Ultima verificare 2026-11-24 02:38 UTC

La sediuNivel nespecificat10+ aniDirector general & conducereNormă întreagăkunin

Compară cerințele cu experiența ta, pregătește documentul și păstrează oportunitatea la candidaturi. Tu trimiți candidatura.

WHO WE ARE

Kunin Technologies is revolutionizing the critical mineral supply chain by implementing advanced separation technologies to capture value from overlooked resources.

Metals are everywhere, in solar panels, smartphones, electric vehicles, but as ore grades plummet globally, traditional extraction methods are failing. China dominates critical minerals markets by developing superior separation technologies that extract value from materials American mines discard as waste.

Utilizing Kunin Technologies' breakthrough performance, ion-exchange media significantly more value can be produced from each resource, reducing waste, and unlocking metal abundance.

To achieve metal abundance, humanity must bring separation science down its own Moore’s Law: fix the idiot cost index for micro and nano scale separation materials. This requires mass manufacturing novel ion-exchange media form factors which previously struggled from high costs.

THE ROLE

Group 14 metals (germanium, tin, silicon) are critical materials of the data center build-out, and Kunin is designing, guaranteeing and commissioning a group 14 metal chlorination plant overseas for an industrial partner: metal-bearing feeds from the partner's own process are converted by chlorination, purification and hydrolysis to an electronic-grade metal product, with Kunin's proprietary ion-exchange media recovering the metal from the dilute process liquors. Bench and mini-pilot process development runs in Chattanooga from December 2026 to May 2027, basic engineering issues in May 2027, the plant is built from modular skids in parallel with civil works, and commercial operation is targeted for the first quarter of 2028. The plant is built and operated by our partner; Kunin owns the process, the design package, the performance guarantee and the training of the operating team.

You own delivery of that plant: scope, schedule, cost and quality from the basic engineering package through mechanical completion, commissioning, the performance test and handover to the partner's operating team. You report to the CEO and work alongside the VP of Engineering, who owns the process design, and the partner's site team, who build and operate. You select and manage the partner-country engineering contractor and the skid fabricator, run the Class 3 capital estimate the partner's board approves, and hold the integrated schedule that ties process development, engineering, fabrication, civil works, training and commissioning to a Q1 2028 commercial operation date.

You build the capital projects function from the first hire: project controls, document control, contractor management, FAT and site acceptance, and the project review cadence with the partner. This is the first of a series of Kunin-designed metal recovery and conversion plants. You are a founding member of Kunin's Capital Projects team, whose goal is 100 critical metal projects in 10 years. Once this plant is through its gates you are expected to be executing design and delivery work on two to three projects in parallel. You build and lead that team.

By 21 May 2027 we expect the basic engineering package and Class 3 estimate issued and long-lead orders released. By 31 December 2027, mechanical completion. By 17 March 2028, a passed performance test and commercial operation.

RESPONSIBILITIES

Overall delivery of the group 14 metal chlorination plant: scope, schedule, cost, quality and HSE from basic engineering to handover

Selection and management of the partner-country engineering and construction contractor and the modular skid fabricator; bid evaluation, contract administration, change control

The Class 3 capital and operating cost estimate, the project budget, and monthly cost and schedule reporting to the joint venture board

The integrated project schedule across process development, basic and detailed engineering, procurement, fabrication, civil works, training and commissioning

Mechanical completion, pre-commissioning and commissioning execution with the VP of Engineering, through the performance test and the commercial operation date

Front-end studies for the next plants: scoping, pre-feasibility and feasibility studies with Class 5 to Class 3 estimates, run in parallel with delivery of the first plant

QUALIFICATIONS AND PREFERRED SKILLS

Bachelor's degree in chemical, mechanical or civil engineering; PMP or equivalent a plus.

10+ years delivering chemical, hydrometallurgical or specialty-gas capital projects, with at least two plants taken from FEED through commissioning as project manager or project director.

Has managed an EPC or EPCM contractor and a fabricator on a modular, skid-built plant; has run a Class 3 estimate and a contractor bid evaluation.

Experience delivering projects overseas with local engineering and construction contractors strongly preferred; chlorine or hydrogen chloride service experience preferred.

Ability to work in fast paced and demanding atmosphere

Creative problem solving that brings together engineering, contracting, cost control and field execution to hold a fixed commercial operation date.

ADDITIONAL REQUIREMENTS

Position located in Chattanooga, Tennessee. Extensive overseas travel to the partner's site required: roughly one week in four during engineering and fabrication, and extended stays on site from November 2027 through the performance test.

Must be a U.S. citizen.

Extended hours and weekends frequently required to support critical project milestones.

Chattanooga is more beautiful than expected, and Tennessee has no income tax.

"The Whole World Is Ion-Exchange And The Rest Are Merely Details!"

Dr. Robert Kunin of Rohm and Haas, The Pioneer of the Ion-Exchange Industry, 1951
Aplică pe site-ul original

Ashby

Aplică cu un cont gratuit

Un cont gratuit îți verifică potrivirea cu jobul, îl salvează în lista de candidaturi și lasă pilotul automat să găsească joburi asemănătoare. Membrii eligibili văd linkul original de aplicare.

Creează cont Autentificare

Cookie-urile esențiale susțin sesiunea și securitatea. Google Analytics și măsurarea publicitară Meta pornesc doar conform alegerilor tale separate. Nu trimitem texte din CV sau date de contact.

Cookies esențiale · mereu active

Sesiunea, protecția CSRF și preferința pentru cookies susțin accesul în cont și alegerea făcută aici.

Google Analytics măsoară pagini publice și acțiuni predefinite după acord. Excludem căutările, CV-urile, ID-urile de cont și tokenurile de plată. Stocarea publicitară și personalizarea rămân dezactivate.

Cu acordul pentru marketing, Meta primește evenimente PageView pe anumite pagini publice de prezentare, URL-ul și informații de rețea/browser pentru măsurarea reclamelor. PageView exclude paginile de CV, căutare joburi, cont și plăți. Potrivirea automată și colectarea automată de evenimente sunt dezactivate. Datele pot fi procesate în afara țării. Refuzul nu limitează instrumentele.

Cu acordul pentru marketing, Google Ads măsoară conturile verificate și achizițiile confirmate printr-un identificator anonim și suma/moneda plății. Fără CV sau date de contact.

Cu acordul pentru marketing, Meta poate păstra identificatorii clicurilor publicitare pe pagina de înscriere pentru atribuirea unui cont verificat ulterior. Deschiderea formularului nu este numărată ca înregistrare.

Cu acordul pentru marketing, Meta măsoară și conturile verificate pe pagina principală a spațiului de lucru, printr-un identificator anonim. Nu primește CV sau date de contact.

Alegerea este păstrată 180 de zile. O poți modifica sau retrage oricând din Setări cookies. Refuzul analizei nu limitează instrumentele de carieră.

Politica de cookies