Normă întreagă
Formulări din sursă, separat de potrivirea profesională. Remote nu înseamnă automat eligibilitate globală sau program flexibil.
Sursa originală: Workday · Publicat 2026-08-12 · Ultima verificare 2026-11-18 07:25 UTC
Compară cerințele cu experiența ta, pregătește documentul și păstrează oportunitatea la candidaturi. Tu trimiți candidatura.
Job Description:
1. FI (Focus improvement) management
1.1 Understand site area loss and cost/loss linkage, co-work with pillar leaders and MSE manager to achieve.
1.2 Business cost benefit by driving loss elimination and 3yrs DiB roadmap through FI pillar activities.
1.3 Build site associates PS (Problem solving) capability to eliminate loss.
1.4 Collaborate with APAC IE for TJN site capacity bottle neck and capacity expansion.
1.5 Robust continue improvement culture and lead site level hard- bones solved &KAIZEN projects.
2. Monitoring Factory Performance, incl. site performance, TRS, DiB, NQC, Productivity, SIG, etc.
2.1 Benchmarking KPIs related data and lead site performance review in site management meeting.
2.2 Co-work with OPS and MAINT. Team for the OEE, TRS leading and lagging KPIs target setting and governance.
2.3 Deep dive the opps for site KPIs and find improvement projects.
2.4 Periodically health check for KPI setting and performance tracking.
3. Deep dive area loss & opportunities and manage all the projects with X-functions
3.1 Safety loss and risk deep diving through collaboration with safety function
3.2 Quality loss and defects deep diving through collaboration with Q&FS function
3.3 Follow 4M1E to analysis area loss (8 types of waste)
3.4 Build projects management system and bring the visibility to all
Aplică pe site-ul original 1. FI (Focus improvement) management
1.1 Understand site area loss and cost/loss linkage, co-work with pillar leaders and MSE manager to achieve.
1.2 Business cost benefit by driving loss elimination and 3yrs DiB roadmap through FI pillar activities.
1.3 Build site associates PS (Problem solving) capability to eliminate loss.
1.4 Collaborate with APAC IE for TJN site capacity bottle neck and capacity expansion.
1.5 Robust continue improvement culture and lead site level hard- bones solved &KAIZEN projects.
2. Monitoring Factory Performance, incl. site performance, TRS, DiB, NQC, Productivity, SIG, etc.
2.1 Benchmarking KPIs related data and lead site performance review in site management meeting.
2.2 Co-work with OPS and MAINT. Team for the OEE, TRS leading and lagging KPIs target setting and governance.
2.3 Deep dive the opps for site KPIs and find improvement projects.
2.4 Periodically health check for KPI setting and performance tracking.
3. Deep dive area loss & opportunities and manage all the projects with X-functions
3.1 Safety loss and risk deep diving through collaboration with safety function
3.2 Quality loss and defects deep diving through collaboration with Q&FS function
3.3 Follow 4M1E to analysis area loss (8 types of waste)
3.4 Build projects management system and bring the visibility to all
Workday
Aplică cu un cont gratuit
Creează cont AutentificareUn cont gratuit îți verifică potrivirea cu jobul, îl salvează în lista de candidaturi și lasă pilotul automat să găsească joburi asemănătoare. Membrii eligibili văd linkul original de aplicare.