roTEAMnet

Environment Performance & Monitoring-2

1000 PT SMART Tbk. · DKI Jakarta, Indonesia

Full-time

Solo formulazione originale; questo è indipendente dall'idoneità professionale. Il lavoro da remoto non implica automaticamente l'idoneità a livello globale o orari flessibili.

Fonte originale: Workday · Pubblicato 2026-10-26 · Ultimo controllo 2026-11-25 14:51 UTC

Modalità di lavoro non specificataLivello non specificato4+ anniTempo pieno1000 PT SMART Tbk. Indonesia

Verifica i requisiti rispetto alla tua esperienza, prepara il documento e conserva l'opportunità nelle tue candidature. Invierai tu stesso la candidatura.

Job Description:

1. Preparing letter to the Ministry of LHK as guidance letter to BLH for documents o new plantation, new mill or AMDAL addendum on mill capacity expansion, plantation expansion, operational change of mill and plantation, AMDAL consultant evaluation, and supervision and revision for environmental permits (IPLH, LA, LB3) in accordance with the scope of the company and related regulatory provisions based on AMDAL consultant's recommendation as well as assisting data collection and submission to the Provincial / District government
2. Preparing technical recommendations and resumes of Government regulations tthe EPM Region Staff for technical assistance to the Unit in fulfilling the environmental requirements of the Certification Standards and in the implementation of IL / IPLH (LA and LB3 Permit) as in the preparation of TPS LB3 waste control facility, spray equipment wash facility, fuel warehouse, chemical warehouse, waste control at workshop, LB3 control, medical waste, emission control as well as providing environmental training in accordance with government regulations and ISPO / RSPO / ISCC, ISO 14001 Standards.
3. Conducting inspection to the Unit in the form of internal audit compliancof AMDAL implementation and environmental management such as liquid waste pool conditions, control of hazardous and toxic Waste (LB3), LA condition, LA bed maintenance, factory housekeeping and pesticide packaging control, air emission, boilers emission control, generators, vehicles from factory and plantation processes, and other wastes in gardens and factories.
4. Proposing budget and regular environmental monitoring plan (technical aspectand cost aspects) in accordance with the results of the accredited and registered environmental laboratory tender in KLHK for conducting surface water (river) testing, LA monitor well, control well, emission test, ambient in plantation and community, boiler and genset test, clean water test, and soil test for 45 mills, 218 estates, 5 KCPs, 10 bulkings.
5. Arranging RKL RPL report for all mill, plantation, and bulking in All PT GAR to KLHK and documenting data for preparing GAR Sustainability Report
6. Conducting PROPER internal audit, documents preparation, and refutation PROPER audit result to KLHK in order not to get red or black PROPER to PROPER as well as making recommendation to the EPM Region Staff member in improving the result of Monitoring Verification Visit and providing assistance to operational units on certification audit (ISPO, RSPO, ISCC), permits (AMDAL, LA, LB3), and environmental management and monitoring.

Job Requierment:

Candidate must possess at least a Bachelor's Degree, Engineering (Environmental/Health/Safety) or equivalent.

Required skill(s): amdal, iplh, ispo / rspo / iscc, iso 14001, LA & LB3.

At least 4 year(s) of working experience in the related field is required for this position.

Applicants must be willing to work in Thamrin.

Preferably Staff (non-management & non-supervisor)s specializing in Engineering - Environmental/Health/Safety or equivalent.

Full-Time position(s) available.

"Our company has never levied any fees for the recruitment process nor has it required to order tickets and accommodation through a certain travel agent or certain person."
Candidati sul sito web originale

Workday

Candidati con un account gratuito

Un account gratuito mostra il link di candidatura originale agli utenti idonei, valuta la tua affinità con l'offerta, la salva nel tuo tracker e consente ad Autopilot di trovare altre offerte simili.

Crea account Accedi

I cookie essenziali supportano la sessione e la sicurezza. Google Analytics e la misurazione pubblicitaria di Meta vengono caricati solo previo consenso specifico. Il testo del CV e i dati di contatto non vengono inviati.

Cookie essenziali · sempre attivi

Sessione, protezione CSRF e preferenze sui cookie. Questi elementi supportano l'accesso all'account e la scelta effettuata in questa sede.

Google Analytics misura le pagine pubbliche e le azioni predefinite previo consenso. Il testo di ricerca, il contenuto del CV, gli ID account e i token di pagamento sono esclusi. L'archiviazione a fini pubblicitari e la personalizzazione restano disattivate.

Con il consenso alle attività di marketing, Meta riceve gli eventi PageView su pagine di presentazione pubbliche selezionate, l'URL della pagina e le informazioni di rete/browser, al fine di misurare l'efficacia pubblicitaria. PageView esclude le pagine di CV, ricerca di lavoro, account e pagamenti. Il matching automatico e la raccolta automatica degli eventi sono disattivati. Meta potrebbe elaborare queste informazioni al di fuori del tuo paese. Il rifiuto non limita l'uso degli strumenti.

Con consenso marketing, Google Ads misura account verificati e acquisti confermati tramite ID anonimo e importo/valuta. Nessun CV o dato di contatto.

Con consenso marketing, Meta può memorizzare gli identificatori dei clic pubblicitari nella pagina di registrazione per attribuire un account verificato successivo. Aprire il modulo non conta come registrazione.

Con consenso marketing, Meta misura anche gli account verificati nella pagina iniziale dello spazio di lavoro tramite un ID anonimo. Nessun CV o dato di contatto.

La tua scelta viene memorizzata per 180 giorni. Puoi modificarla o revocarla in qualsiasi momento tramite le Impostazioni cookie. Il rifiuto dei cookie di analisi non limita gli strumenti di carriera.

Informativa sui cookie