roTEAMnet

VP of Capital Projects

kunin · Chattanooga

Temps pleinContrat / B2B

Mentions de la source, distinctes de l’adéquation professionnelle. Remote ne signifie pas automatiquement accès mondial ou horaires flexibles.

Source originale: Ashby · Publiée le 2026-10-12 · Dernière vérification 2026-11-24 02:38 UTC

Sur siteNiveau non précisé10+ ansDirection généraleTemps pleinkunin

Comparez les exigences à votre expérience, préparez votre document et suivez l’offre. Vous envoyez vous-même la candidature.

WHO WE ARE

Kunin Technologies is revolutionizing the critical mineral supply chain by implementing advanced separation technologies to capture value from overlooked resources.

Metals are everywhere, in solar panels, smartphones, electric vehicles, but as ore grades plummet globally, traditional extraction methods are failing. China dominates critical minerals markets by developing superior separation technologies that extract value from materials American mines discard as waste.

Utilizing Kunin Technologies' breakthrough performance, ion-exchange media significantly more value can be produced from each resource, reducing waste, and unlocking metal abundance.

To achieve metal abundance, humanity must bring separation science down its own Moore’s Law: fix the idiot cost index for micro and nano scale separation materials. This requires mass manufacturing novel ion-exchange media form factors which previously struggled from high costs.

THE ROLE

Group 14 metals (germanium, tin, silicon) are critical materials of the data center build-out, and Kunin is designing, guaranteeing and commissioning a group 14 metal chlorination plant overseas for an industrial partner: metal-bearing feeds from the partner's own process are converted by chlorination, purification and hydrolysis to an electronic-grade metal product, with Kunin's proprietary ion-exchange media recovering the metal from the dilute process liquors. Bench and mini-pilot process development runs in Chattanooga from December 2026 to May 2027, basic engineering issues in May 2027, the plant is built from modular skids in parallel with civil works, and commercial operation is targeted for the first quarter of 2028. The plant is built and operated by our partner; Kunin owns the process, the design package, the performance guarantee and the training of the operating team.

You own delivery of that plant: scope, schedule, cost and quality from the basic engineering package through mechanical completion, commissioning, the performance test and handover to the partner's operating team. You report to the CEO and work alongside the VP of Engineering, who owns the process design, and the partner's site team, who build and operate. You select and manage the partner-country engineering contractor and the skid fabricator, run the Class 3 capital estimate the partner's board approves, and hold the integrated schedule that ties process development, engineering, fabrication, civil works, training and commissioning to a Q1 2028 commercial operation date.

You build the capital projects function from the first hire: project controls, document control, contractor management, FAT and site acceptance, and the project review cadence with the partner. This is the first of a series of Kunin-designed metal recovery and conversion plants. You are a founding member of Kunin's Capital Projects team, whose goal is 100 critical metal projects in 10 years. Once this plant is through its gates you are expected to be executing design and delivery work on two to three projects in parallel. You build and lead that team.

By 21 May 2027 we expect the basic engineering package and Class 3 estimate issued and long-lead orders released. By 31 December 2027, mechanical completion. By 17 March 2028, a passed performance test and commercial operation.

RESPONSIBILITIES

Overall delivery of the group 14 metal chlorination plant: scope, schedule, cost, quality and HSE from basic engineering to handover

Selection and management of the partner-country engineering and construction contractor and the modular skid fabricator; bid evaluation, contract administration, change control

The Class 3 capital and operating cost estimate, the project budget, and monthly cost and schedule reporting to the joint venture board

The integrated project schedule across process development, basic and detailed engineering, procurement, fabrication, civil works, training and commissioning

Mechanical completion, pre-commissioning and commissioning execution with the VP of Engineering, through the performance test and the commercial operation date

Front-end studies for the next plants: scoping, pre-feasibility and feasibility studies with Class 5 to Class 3 estimates, run in parallel with delivery of the first plant

QUALIFICATIONS AND PREFERRED SKILLS

Bachelor's degree in chemical, mechanical or civil engineering; PMP or equivalent a plus.

10+ years delivering chemical, hydrometallurgical or specialty-gas capital projects, with at least two plants taken from FEED through commissioning as project manager or project director.

Has managed an EPC or EPCM contractor and a fabricator on a modular, skid-built plant; has run a Class 3 estimate and a contractor bid evaluation.

Experience delivering projects overseas with local engineering and construction contractors strongly preferred; chlorine or hydrogen chloride service experience preferred.

Ability to work in fast paced and demanding atmosphere

Creative problem solving that brings together engineering, contracting, cost control and field execution to hold a fixed commercial operation date.

ADDITIONAL REQUIREMENTS

Position located in Chattanooga, Tennessee. Extensive overseas travel to the partner's site required: roughly one week in four during engineering and fabrication, and extended stays on site from November 2027 through the performance test.

Must be a U.S. citizen.

Extended hours and weekends frequently required to support critical project milestones.

Chattanooga is more beautiful than expected, and Tennessee has no income tax.

"The Whole World Is Ion-Exchange And The Rest Are Merely Details!"

Dr. Robert Kunin of Rohm and Haas, The Pioneer of the Ion-Exchange Industry, 1951
Postuler sur le site d’origine

Ashby

Postulez avec un compte gratuit

Un compte gratuit vérifie votre adéquation, enregistre l’offre dans votre suivi et laisse le pilote trouver des offres similaires. Les membres éligibles voient le lien de candidature d’origine.

Créer un compte Se connecter

Les cookies essentiels assurent la session et la sécurité. Google Analytics et la mesure publicitaire Meta se chargent selon vos choix séparés. Aucun CV ni coordonnées ne sont transmis.

Cookies essentiels · toujours actifs

Session, protection CSRF et choix des cookies permettent l’accès au compte et mémorisent votre décision.

Google Analytics mesure les pages publiques et des actions prédéfinies après accord. Recherches, CV, identifiants de compte et jetons de paiement sont exclus. Stockage publicitaire et personnalisation restent désactivés.

Avec votre accord marketing, Meta reçoit PageView sur certaines pages publiques de présentation, l’URL et des informations réseau/navigateur pour mesurer les publicités. PageView exclut les pages CV, recherche d’emploi, compte et paiements. Rapprochement et événements automatiques sont désactivés. Un traitement hors de votre pays est possible. Refuser ne limite pas les outils.

Avec votre consentement marketing, Google Ads mesure les comptes vérifiés et achats confirmés avec un identifiant anonyme et le montant/la devise. Aucun CV ni coordonnées.

Avec votre consentement marketing, Meta peut conserver les identifiants de clic publicitaire sur la page d’inscription pour attribuer un compte vérifié ultérieur. Ouvrir le formulaire ne compte pas comme une inscription.

Avec votre consentement marketing, Meta mesure aussi la création de compte vérifié sur l’accueil de votre espace avec un identifiant anonyme. Aucun CV ni coordonnées.

Votre choix est conservé 180 jours. Modifiez-le ou retirez-le à tout moment dans les réglages. Refuser la mesure ne limite pas les outils.

Politique de cookies