roTEAMnet

Intern, Medium Voltage Test Engineering

heron-power · Scotts Valley

Temps plein

Mentions de la source, distinctes de l’adéquation professionnelle. Remote ne signifie pas automatiquement accès mondial ou horaires flexibles.

Source originale: Ashby · Publiée le 2026-09-30 · Dernière vérification 2026-11-23 19:18 UTC

Comparez les exigences à votre expérience, préparez votre document et suivez l’offre. Vous envoyez vous-même la candidature.

What to Expect

Heron Power is a startup company building cutting-edge power electronics for the 21st-century grid. We aim to de-bottleneck the growth of electricity generation and consumption with scalable, innovative, and less costly hardware solutions, accelerating the electrification of everything.

Our first goal is to build better converters (inverters & rectifiers) to connect large-scale renewables, storage, and loads to the grid. Heron’s leadership team is made up of seasoned veterans who have designed and shipped gigawatts of power conversion products over the past decade.

We understand that no one individual knows everything. We will all learn a lot together and from each other. We strive to build a collaborative, enriching environment conducive to personal, technical, and career growth. You can expect to work in a dynamic environment, driven by first principles engineering, solving difficult problems—with a strong bias toward hands-on execution and learning by doing.

Job Overview

You will build and operate the high-voltage test infrastructure we use to characterize and qualify insulation systems in medium-voltage power electronics. This role owns a real piece of the reliability validation loop: test bench setup, dielectric characterization campaigns, degradation analysis, and structured failure mode documentation. You will work with equipment and methodologies that most EE programs never expose students to—and you will be building the data foundation that informs how we design insulation systems for grid-tied hardware at scale.

How You Will Contribute

Medium Voltage Test Infrastructure

Design, build, and operate medium-voltage test benches: HV power supplies, measurement dividers, partial discharge detection systems, protective earthing schemes, and safety interlocks.

Own bench system design: HV clearances, grounding architecture, protection strategy, measurement integrity, and safe operating procedures.

Build and document test fixtures for cable assemblies, busbars, insulation specimens, and HV subcomponents—to a standard someone else can operate safely.

Learn and strictly enforce MV lab safety protocols: electrical clearances, interlock design, lockout/tagout, and safe approach procedures.

Dielectric Characterization & Testing

Execute dielectric strength tests—AC/DC withstand and impulse—against defined acceptance criteria; own data collection and reporting.

Perform insulation resistance, polarization index, and dielectric loss (tan δ) measurements using HV megohmmeters, LCR bridges, and dielectric analyzers.

Run partial discharge (PD) measurements end to end: system setup, acquisition, PRPD pattern generation, and first-pass interpretation.

Execute accelerated aging and environmental stress campaigns on insulating materials under thermal, humidity, and combined stress conditions.

Degradation Analysis & Closing the Loop

Track and analyze degradation trends across test campaigns: capacitance drift, tan δ evolution, PD magnitude and repetition rate, breakdown statistics.

Build structured data workflows and visualizations that clearly show baseline, stressed, and failed states—and make the trajectory actionable.

Produce failure mode documentation: what failed, what the failure mechanism was, what the precursor signals were, and what changed.

Partner with design and materials engineering to translate test findings into corrective actions and design improvements.

Materials Characterization & Inspection

Support post-failure analysis: specimen dissection, cross-section preparation, visual and microscopic inspection, comparison against reference specimens.

Maintain sample tracking logs, calibration records, and test procedure documentation to production-quality standards.

What You Will Bring

We prioritize a strong foundation in first principles, practical skill, an inquisitive mindset, and a proactive attitude. We care as much—or more—about how you work as what you already know.

Must-Have

Pursuing a BS or MS in Electrical Engineering, Physics, or Materials Science.

Coursework in electromagnetics, dielectrics, or high-voltage engineering—or demonstrated independent study in this area.

Genuine technical interest in high-voltage physics, insulation behavior, and failure mechanisms.

Strong debugging instincts: ability to isolate failure modes, design targeted experiments, and close findings into documented root causes.

Detail-oriented and safety-conscious—MV lab work demands rigor and discipline.

Nice-to-Haves

Exposure to partial discharge theory, dielectric spectroscopy, or high-voltage lab techniques.

Familiarity with IEC or IEEE dielectric testing standards (IEC 60243, IEC 60270, or similar).

Experience with data analysis and visualization in Python or MATLAB.

Prior lab research in materials characterization, high-voltage systems, or power electronics.

If you are passionate about technology and enjoy working in a fast-paced environment, we would love to hear from you. Join us in accelerating the electrification of everything at Heron Power.
Postuler sur le site d’origine

Ashby

Postulez avec un compte gratuit

Un compte gratuit vérifie votre adéquation, enregistre l’offre dans votre suivi et laisse le pilote trouver des offres similaires. Les membres éligibles voient le lien de candidature d’origine.

Créer un compte Se connecter

Les cookies essentiels assurent la session et la sécurité. Google Analytics et la mesure publicitaire Meta se chargent selon vos choix séparés. Aucun CV ni coordonnées ne sont transmis.

Cookies essentiels · toujours actifs

Session, protection CSRF et choix des cookies permettent l’accès au compte et mémorisent votre décision.

Google Analytics mesure les pages publiques et des actions prédéfinies après accord. Recherches, CV, identifiants de compte et jetons de paiement sont exclus. Stockage publicitaire et personnalisation restent désactivés.

Avec votre accord marketing, Meta reçoit PageView sur certaines pages publiques de présentation, l’URL et des informations réseau/navigateur pour mesurer les publicités. PageView exclut les pages CV, recherche d’emploi, compte et paiements. Rapprochement et événements automatiques sont désactivés. Un traitement hors de votre pays est possible. Refuser ne limite pas les outils.

Avec votre consentement marketing, Google Ads mesure les comptes vérifiés et achats confirmés avec un identifiant anonyme et le montant/la devise. Aucun CV ni coordonnées.

Avec votre consentement marketing, Meta peut conserver les identifiants de clic publicitaire sur la page d’inscription pour attribuer un compte vérifié ultérieur. Ouvrir le formulaire ne compte pas comme une inscription.

Avec votre consentement marketing, Meta mesure aussi la création de compte vérifié sur l’accueil de votre espace avec un identifiant anonyme. Aucun CV ni coordonnées.

Votre choix est conservé 180 jours. Modifiez-le ou retirez-le à tout moment dans les réglages. Refuser la mesure ne limite pas les outils.

Politique de cookies