Project Controls Director

Total Resourcing Ltd · Cernavodă, Constanța, RO

Full-timeContract / B2B

Source wording only; this is separate from professional fit. Remote does not automatically mean worldwide eligibility or flexible hours.

Original source: Workable · Published 2026-09-22 · Last checked 2026-11-26 21:23 UTC

Work arrangement not specifiedLevel not specified15+ yrsGeneral manager & executiveFull-timeTotal Resourcing Ltd Romania

Check the requirements against your experience, prepare your document and keep the opportunity in your applications. You submit the application yourself.

Purpose of the Role

The Project Controls Director holds overall accountability for designing, deploying, and directing a comprehensive, fit-for-purpose project controls system for a new nuclear new-build project.

The primary objective is to give the Project Director and executive leadership an objective, evidence-based picture of project health across scope, milestones, expenditure, actual progress, risks, and emerging changes. Operating within approved project governance, the role ensures that project data directly informs timely, corrective decisions rather than serving solely as historical documentation.

The Director establishes the governance baseline linking Work Breakdown Structures (WBS), organisational accountabilities, budgets, integrated schedules, and performance analytics. Controls must remain proportionate: rigorous enough to spotlight critical-path risks and schedule erosion early, yet sufficiently streamlined to drive action across site delivery teams without excessive administrative burden.

Core Accountabilities

1. Integrated Planning & Scheduling

Build and govern an overarching programme WBS that defines all deliverable work packages, establishing the sole baseline for budget allocation, scope assignment, schedule tracking, and formal progress reporting.

Oversee a structured schedule framework spanning Level 1 (milestones), Level 2 (cross-discipline coordination), Level 3 (detailed project control), Level 4 (field execution and look-ahead plans), and targeted Level 5 detail where site coordination demands it.

Define standardized planning standards, coding conventions, working calendars, update rhythms, and schedule integrity rules.

Maintain logical alignment across all life-cycle stages: nuclear licensing, engineering design, global procurement, off-site manufacturing, civil construction, cold/hot commissioning, and operational handover.

Establish approved baselines for scope, cost, and schedule; prevent informal or unapproved baseline adjustments.

Ensure all delivery plans are resource-loaded, risk-informed, realistic, and fully endorsed by the managers responsible for execution.

Drive rolling 90-day look-ahead schedules focusing specifically on high-priority interfaces, site access constraints, and near-critical paths.

2. Multi-Contractor Schedule Harmonisation

Integrate and align independent schedules delivered by EPC contractors, nuclear steam supply system (NSSS) vendors, key equipment fabricators, and internal teams into a single Master Schedule.

Systematically audit contractor schedules for logic integrity, achievable productivity assumptions, sequence realism, and contractual compliance.

Ensure structural alignment among schedule data, commercial commitments, financial budgets, and project risks.

3. Progress Tracking & Performance Verification

Establish verifiable, physical progress-measurement rules across each work package to prevent optimistic or subjective reporting.

Monitor live project performance against approved baseline parameters for time, expenditure, workforce deployment, deliverables, and quality milestones.

Maintain auditable project data covering actual start/finish dates, remaining durations, estimate-to-complete (ETC) figures, and committed funds.

Detect and call out emerging delivery bottlenecks, out-of-sequence activities, declining float values, and shifts in the primary critical path.

Hold work package leads accountable for crafting and executing recovery initiatives whenever variances occur; escalate critical deviations immediately.

Produce milestone forecasts grounded strictly in current field data and valid schedule logic rather than unverified best-case assumptions.

4. Cost Engineering & Budget Control

Establish and govern the time-phased cost control baseline tied directly to the WBS, control accounts, contract commitments, and integrated schedule.

Supervise committed expenditure, incurred costs, accruals, cash-flow models, Estimate at Completion (EAC), and project contingencies.

Ensure unified coding structures and seamless reconciliation across controls, financial accounting, contract management, and commercial systems.

Use Earned Value Management (EVM) to track cost/schedule indices, isolate root causes of performance deviations, and model projected outcomes.

Publish regular cost-variance reports that explicitly detail drivers, financial impacts, named owners, and planned corrective measures.

Quantify the cost implications of proposed scope changes, contractor claims, delay events, and schedule acceleration strategies before governance approvals.

Maintain strict change logs so that only sanctioned scope adjustments adjust the baseline budget or contingency allowances.

Challenge unrealistic financial estimates and promptly raise risks of budget pressure or early contingency exhaustion.

5. Critical Path & Delay Management

Perform ongoing Critical Path Method (CPM) analyses to track schedule vulnerability.

Identify field constraints, inter-contract handoffs, and resource bottlenecks that threaten critical path tasks.

Model recovery scenarios and acceleration options to support informed trade-off decisions.

6. Risk-Informed Project Planning

Embed risk management directly into daily scheduling, budget forecasting, and scope-change evaluations rather than treating it as a siloed exercise.

Keep executive visibility focused on the high-impact risks that threaten plant safety, quality certification, licensing milestones, cost, or target commercial operation dates.

Ensure every material risk has a designated owner, a scheduled mitigation workflow, and defined residual impact ratings.

Evaluate schedule and cost contingency adequacy using practical construction insight combined with quantitative risk analysis (such as QSRA).

Drive risk reviews toward practical mitigation actions, formal escalations, or explicit acceptance rather than passive list-keeping.

7. Interface Management

Align scheduling boundaries and handoffs across key functional stakeholders:

System Engineering & Design

Global Supply Chain & Procurement

Site Construction & Civil Works

Plant Commissioning

Nuclear Safety Licensing & Regulatory Approvals

Plant Operations Readiness

Owner & Government Stakeholders

Ensure interface points, battery limits, and transfer milestones are accurately mapped inside the master logic network.

8. Executive Reporting & Transparency

Produce concise, exception-focused reports highlighting milestone projections, float movement, cost run-rates, principal project risks, and decisions requiring executive intervention.

Publish a unified monthly project controls briefing featuring detailed variance analyses, schedule logic adjustments, scope movements, and forward-looking plans.

Facilitate weekly and monthly controls reviews centered on proactive problem resolution and action item tracking.

Deliver objective assessments of overall status directly to the Project Director, the Plant Owner, and oversight committees.

9. Change Governance & Controls Architecture

Evaluate time and cost impacts for every proposed technical revision, commercial variation, or regulatory adjustment prior to approval.

Serve as a key advisor to the project Change Control Board (CCB), recording all baseline adjustments and rationale.

Institute standard planning protocols, maintain project control guidelines, run regular maturity audits, and lead continuous workflow improvements.

Drive the use of integrated digital project management platforms, ensuring reliable data flow across scheduling, document controls, and live visual dashboards.

Leadership & People Management

Direct and coach a lean, capable project controls unit, ensuring clear individual accountabilities and minimal functional overlap.

Promote a transparent, results-oriented culture where bad news travels fast, assumptions are constructively debated, and the team speaks with a unified project voice.

Work as a collaborative peer within the leadership team, establishing close partnerships with engineering, site construction, quality, commercial, and financial directors.

Transfer skills and build long-term capability within the team and Owner teams through active mentorship and hands-on guidance.

Maintain an uncompromising commitment to nuclear safety and regulatory compliance; ensure schedule pressures never compromise quality standards.

Requirements

Required Background & Experience

Total Experience: At least 15 years of progressive project controls management, including senior leadership oversight on mega-scale capital infrastructure projects.

Nuclear Delivery: Proven, demonstrable track record delivering project controls leadership on nuclear power new-build programmes.

Technology Background: Direct delivery experience on Gen III+ nuclear projects, specifically AP1000 and/or APR1400 technologies.

Full-Lifecycle Scope: Demonstrated experience unifying WBS structures, multi-tier schedules, cost systems, risk tools, and executive reporting across design, construction, and testing phases.

Multi-Contractor Governance: Demonstrated capability leading controls across large international consortia, major EPC contractors, and global component vendors.

Issue Resolution: Proven history of identifying path delays early, proposing viable schedule recovery options, and driving corrective action to completion.

Skills & Capabilities

Technical Capabilities

Advanced Integrated Master Scheduling (IMS) and Critical Path Method (CPM)

Earned Value Management (EVM) standard frameworks (performance measurement baseline, variance indices, EAC modeling)

Quantitative Schedule & Cost Risk Analysis (QSRA / QCRA)

Resource leveling, constraint management, and forensic delay analysis

Complete cost forecasting, cash-flow modeling, and contingency governance

Software & Systems

Primavera P6 (advanced proficiency required)

Primavera Risk Analysis / Oracle Primavera Cloud

Microsoft Project & Advanced Microsoft Excel

Power BI and modern automated reporting/dashboard platforms

Leadership & Strategic Competencies

Clear communication with senior project executives and public stakeholders

Constructive negotiation and contract administration capability

High-pressure decision-making and pragmatic problem resolution

Cross-discipline team coordination and performance management

Benefits

Competitive salary and executive-level benefits package.

Opportunity to lead a strategic energy infrastructure project of national and international significance.

Collaborative, multicultural working environment.
Apply on the original website

Workable

Apply with a free account

A free account shows the original application link to eligible members, checks your fit with this job, saves it to your tracker and lets Autopilot find more jobs like it.

Create account Log in

Essential cookies support your session and security. Google Analytics and Meta advertising measurement load only with your separate choices. CV text and contact details are not sent.

Essential cookies · always active

Session, CSRF protection and your cookie preference. These support account access and the choice you make here.

Google Analytics measures public pages and predefined actions after consent. Search text, CV content, account IDs and payment tokens are excluded. Advertising storage and personalization remain disabled.

With marketing consent, Meta receives PageView events on selected public presentation pages, the page URL and network/browser information, to measure advertising. PageView collection excludes CV, job search, account and payment pages. Automatic matching and automatic event collection are disabled. Meta may process this information outside your country. Declining does not restrict tools.

With marketing consent, Google Ads measures verified account creation and confirmed purchases using an anonymous event ID and purchase amount/currency. No CV or contact details are sent.

With marketing consent, Meta may store advertising click identifiers on the registration page to attribute a later verified signup. Opening the form is not counted as a registration.

With marketing consent, Meta also records verified account creation on the workspace home page using an anonymous event ID. It receives no CV or contact details.

Your choice is stored for 180 days. Change or withdraw it at any time using Cookie settings. Declining analytics does not restrict career tools.

Cookie Policy