roTEAMnet

Environment Performance & Monitoring-2

1000 PT SMART Tbk. · DKI Jakarta, Indonesia

Vollzeit

Nur Quellenangaben; getrennt von fachlicher Passung. Remote bedeutet nicht automatisch weltweite Zulassung oder flexible Stunden.

Originalquelle: Workday · Veröffentlicht 2026-10-26 · Zuletzt geprüft 2026-11-25 14:51 UTC

Arbeitsmodell nicht angegebenNiveau nicht angegeben4+ J.Vollzeit1000 PT SMART Tbk. Indonesien

Prüfe die Anforderungen anhand deiner Erfahrung, erstelle dein Dokument und speichere die Stelle. Du sendest die Bewerbung selbst.

Job Description:

1. Preparing letter to the Ministry of LHK as guidance letter to BLH for documents o new plantation, new mill or AMDAL addendum on mill capacity expansion, plantation expansion, operational change of mill and plantation, AMDAL consultant evaluation, and supervision and revision for environmental permits (IPLH, LA, LB3) in accordance with the scope of the company and related regulatory provisions based on AMDAL consultant's recommendation as well as assisting data collection and submission to the Provincial / District government
2. Preparing technical recommendations and resumes of Government regulations tthe EPM Region Staff for technical assistance to the Unit in fulfilling the environmental requirements of the Certification Standards and in the implementation of IL / IPLH (LA and LB3 Permit) as in the preparation of TPS LB3 waste control facility, spray equipment wash facility, fuel warehouse, chemical warehouse, waste control at workshop, LB3 control, medical waste, emission control as well as providing environmental training in accordance with government regulations and ISPO / RSPO / ISCC, ISO 14001 Standards.
3. Conducting inspection to the Unit in the form of internal audit compliancof AMDAL implementation and environmental management such as liquid waste pool conditions, control of hazardous and toxic Waste (LB3), LA condition, LA bed maintenance, factory housekeeping and pesticide packaging control, air emission, boilers emission control, generators, vehicles from factory and plantation processes, and other wastes in gardens and factories.
4. Proposing budget and regular environmental monitoring plan (technical aspectand cost aspects) in accordance with the results of the accredited and registered environmental laboratory tender in KLHK for conducting surface water (river) testing, LA monitor well, control well, emission test, ambient in plantation and community, boiler and genset test, clean water test, and soil test for 45 mills, 218 estates, 5 KCPs, 10 bulkings.
5. Arranging RKL RPL report for all mill, plantation, and bulking in All PT GAR to KLHK and documenting data for preparing GAR Sustainability Report
6. Conducting PROPER internal audit, documents preparation, and refutation PROPER audit result to KLHK in order not to get red or black PROPER to PROPER as well as making recommendation to the EPM Region Staff member in improving the result of Monitoring Verification Visit and providing assistance to operational units on certification audit (ISPO, RSPO, ISCC), permits (AMDAL, LA, LB3), and environmental management and monitoring.

Job Requierment:

Candidate must possess at least a Bachelor's Degree, Engineering (Environmental/Health/Safety) or equivalent.

Required skill(s): amdal, iplh, ispo / rspo / iscc, iso 14001, LA & LB3.

At least 4 year(s) of working experience in the related field is required for this position.

Applicants must be willing to work in Thamrin.

Preferably Staff (non-management & non-supervisor)s specializing in Engineering - Environmental/Health/Safety or equivalent.

Full-Time position(s) available.

"Our company has never levied any fees for the recruitment process nor has it required to order tickets and accommodation through a certain travel agent or certain person."
Auf der Originalseite bewerben

Workday

Mit einem kostenlosen Konto bewerben

Ein kostenloses Konto prüft deine Passung, speichert die Stelle in deiner Übersicht und lässt Autopilot ähnliche Stellen finden. Berechtigte Mitglieder sehen den Original-Bewerbungslink.

Konto erstellen Anmelden

Notwendige Cookies sichern Sitzung und Schutz. Google Analytics und Meta-Werbemessung laden nur nach Ihrer jeweiligen Auswahl. Keine Lebenslauftexte oder Kontaktdaten.

Notwendige Cookies · immer aktiv

Sitzung, CSRF-Schutz und Cookie-Auswahl ermöglichen Kontozugriff und speichern Ihre Entscheidung.

Google Analytics misst nach Zustimmung öffentliche Seiten und festgelegte Aktionen. Suchtexte, Lebensläufe, Konto-IDs und Zahlungstoken sind ausgeschlossen. Werbespeicherung und Personalisierung bleiben deaktiviert.

Nach Marketing-Zustimmung erhält Meta PageView-Ereignisse auf ausgewählten öffentlichen Informationsseiten, Seiten-URL und Netzwerk-/Browserdaten zur Werbemessung. PageView erfasst keine Lebenslauf-, Jobsuche-, Konto- oder Zahlungsseiten. Automatischer Abgleich und automatische Ereignisse sind deaktiviert. Verarbeitung außerhalb Ihres Landes ist möglich. Ablehnen beschränkt keine Tools.

Mit Marketing-Einwilligung misst Google Ads bestätigte Konten und Käufe mit anonymer Ereignis-ID sowie Betrag/Währung. Keine Lebenslauf- oder Kontaktdaten.

Mit Marketing-Einwilligung kann Meta auf der Registrierungsseite Anzeigen-Klickkennungen speichern, um eine spätere bestätigte Anmeldung zuzuordnen. Das Öffnen des Formulars zählt nicht als Registrierung.

Mit Marketing-Einwilligung erfasst Meta auf der Workspace-Startseite auch die Konto-Bestätigung mit anonymer Ereignis-ID. Keine Lebenslauf- oder Kontaktdaten.

Ihre Auswahl wird 180 Tage gespeichert. In den Cookie-Einstellungen jederzeit ändern oder widerrufen. Ohne Analyse bleiben die Karrieretools verfügbar.

Cookie-Richtlinie